Sunday, May 14, 2017

Boeing resumes 737 MAX test flights after brief grounding

http://ift.tt/1jUfBeX

Boeing resumes 737 MAX test flights after brief groundingBoeing Co said on Friday it resumed test flights of its $110-million 737 MAX 8 jetliner, just two days after saying it had grounded the entire fleet to address an engine problem. The resumption of flights, which the plane maker said was backed by air safety regulators, is good news for Boeing and engine-maker CFM International, a joint venture between General Electric Co and Safran SA of France.

May 14, 2017 at 08:19PM

http://ift.tt/2qFX7dz

from

http://ift.tt/2qFX7dz


No comments:

Post a Comment