http://ift.tt/eA8V8J
WORCESTER, Mass.--(BUSINESS WIRE)--Siemens has begun work on the second phase of a 10-year energy performance contract with UMass Memorial Health Care (UMass Memorial), designed to align with the health care system’s master energy plan to reduce energy consumption and energy purchasing costs, while maximizing the use of renewable energy wherever possible. With Phase 2 underway, UMass Memorial is projected to save almost 2 million kilowatt hours of electric energy in the project’s first year, an
April 04, 2017 at 12:16AM
http://ift.tt/2oRyXI9
from
http://ift.tt/2oRyXI9
No comments:
Post a Comment